top of page

Long Lead Regular - 5 Metres Long with snaphook and handle.

 

The ideal tool for training dogs and puppies for Recall,or allowing dogs to roam in the park, or the beach, while still maintaining lead control.

 

An excellent light weight long lead that enables the dog to learn recall without the weight of a heavy lead.

 

Enjoy the Blackdog Wear Regular Long Leads.

Long Lead 5 Metres

$39.95Price
Colour
  • Regular: 20mm wide webbing, Regular snaphook. 

© 2025 by Jake and Sasha. Power Pooches AU (registered) & Power Pooches all rights reserved.  Website designed by Power Pooches, Australia.  Created using Wix  ABN: 27 721 069 760 - Jake Cini

  • Facebook
  • YouTube
  • Instagram
bottom of page